AM Ground Systems Company

Home Projects Quote Request Services & Contact About Links
Toll Free:  1-877-766-2999  Local: 931-766-2999
AGSC NEWS
UPDATING NEWS

Please standby...

Method of Moments array design and proofing approved by the FCC.

AGSC begins MoM proof retrofit preparations for stations.

Story

Law Enforcement Officials overjoyed that Heroin use is increasing...

Story

New State laws aimed at curbing copper theft seem to be working.

Story

 

2010

WQEW  New York, NY
August 2010

Repair original ground system where builder used incorrect brazing alloy, install ATU arc gaps and other repair work.

KILT  Houston, TX
January & August 2010

MoM Preparation.  Install new sample lines, fences and other grounding

KIKK Houston, TX
August 2010

Install fence grounding

WAGG  Birmingham, AL
May 2010

Repair ground system damage caused by construction around towers.

WIOZ  Aberdeen, NC
March 2010

Evaluate vandalism to ground system and feed system.

KWAM  Memphis, TN
July 2010

Locate and mark ground system and feed lines for future site construction.

 
 
 
 

2009

WRLM  Irondale, AL
Janurary 2009

Install new ND ground system

KELP  El Paso, TX
March 2009

Rebuild 3 tower ground system following construction damage

WQXI  Atlanta, GA
December 2008

Rebuild 2 tower DA ground system and other grounding work

WBCO  Bucyrus, OH
August 2008

Install new sample line via Directional Boring

WABC.  New York, NY
July 2008

Ground System Evaluation and Repair

KRVN  Holdredge, NE
July 2007

Ground System Evaluation

WBWL  Jacksonville, FL
June 2008

Rebuild 5 tower Inline DA

KWAM  West Memphis, AR
Feburary 2008 and beyond

Refurbish array infrastructure, site access, array tuneup

XEGH  Rio Bravo, Mexico
November 2007

Build new ground system

KTIS  Minneapolis, MN
October 2007

Evaluate and repair ground system

WILC  Laurel, MD
July 2007

Repair and enhance tower base grounding

KDWA  Hastings, MN
July 2007

Build new ground system

WIBC  Indianapolis IN
July 2007

Repair and enhance tower base grounding

WNOG  Naples FL
June 2007

Ground System Evaluation

WYHL  Meridian MS
June 2007

Rebuild ND Ground System

KZDC  San Antonio TX
March 2007

Build New 4 tower ground system

WCIN  Cincinnati OH
June 2007

Repair vandalism damage.

WMBG  Williamsburg VA
March 2007

Build New ND ground system

KCRG Cedar Rapids, IA

 

October 2006

Rebuild 3 tower ground system and install new feed and sample lines.

KRLD Dallas TX

December 2006

Rebuild 2 tower array ground system and building ground infrastructure.

WPHE Phoenixville, PA

September 2006

2 tower DA rebuild

KDWA Hastings, MN

July 2006 ND Build

WCIN Cincinnati, OH

Feb.  2006  5 twr DA Build

WNDA Deland, FL

Dec. 2005  ND Rebuild

KMOX St. Louis, Mo

Nov. 2005  ND Rebuild & other work.

 
     
     
     
 

This Page has had

 
 

Hit Counter

 
 

Visitors Since The Site was Rebuilt September '05

 
     

KWAM

Feburary 2008

KWAM was recently purchased by a small radio group from a mega radio group.  It was a pile of junk.  And that is being very kind and gentle...

The transmitter site is on the bank of the Mighty Mississippi River just west of Memphis.  All station equipment is mounted 20+ft AGL to stay above what we assume is the 500 year flood level.

Among the many, many problems at this site were...

  • Dangerous cobbled together ladders up to tower platforms.

  • EXTREMELY dangerous wiring to ATUs and tower lights.

  • Array badly hacked and mis-adjusted but operating legally on an STA.

  • Fences mostly falling down.

  • ATU boxes rusted out.

  • Ground system damaged / vandalized

AGSC and alter-ego KK Broadcast Engineering began what was obviously going to be a long term project to get this mess cleaned up.  We immediately built and installed new steel ladders for all 3 towers.  We immediately reworked the fences to close gaps where boards had fallen off.  We immediately began work to correct the array parameters.  We immediately installed new ATU control wiring to 2 towers and repaired some of the tower light wiring to make it safer to work around.

The Mississippi flooded thru May and June '08.  7+ feet of water covered the entire site.  The only access was by boat.

As the project progresses, I will post pictures but must wait for now.

 

 

 

 

 

 

 

 

 

 