Method of Moments array design and proofing approved by the FCC.

AGSC begins MoM proof retrofit preparations for stations.

Story

Law Enforcement Officials overjoyed that Heroin use is increasing...

Story

New State laws aimed at curbing copper theft seem to be working.

Story

 
 
WRLM Irondale, AL
Janurary 2009

Install new ND ground system

KELP  El Paso, TX
March 2009

Rebuild 3 tower ground system following construction damage

WQXI Atlanta, GA
December 2008

Rebuild 2 tower DA ground system and other grounding work

WBCO Bucyrus, OH
August 2008

Install new sample line via Directional Boring

WABC.  New York, NY
July 2008

Ground System Evaluation and Repair

KRVN Holdredge, NE
July 2007

Ground System Evaluation

WBWL  Jacksonville, FL
June 2008

Rebuild 5 tower Inline DA

KWAM West Memphis, AR
Feburary 2008 and beyond

Refurbish array infrastructure, site access, array tuneup

XEGH Rio Bravo, Mexico
November 2007

Build new ground system

KTIS Minneapolis, MN
October 2007

Evaluate and repair ground system

WILC  Laurel, MD
July 2007

Repair and enhance tower base grounding

KDWA Hastings, MN
July 2007

Build new ground system

WIBC  Indianapolis IN
July 2007

Repair and enhance tower base grounding

WNOG Naples FL
June 2007

Ground System Evaluation

WYHL  Meridian MS
June 2007

Rebuild ND Ground System

KZDC  San Antonio TX
March 2007

Build New 4 tower ground system

WCIN  Cincinnati OH
June 2007

Repair vandalism damage.

WMBG  Williamsburg VA
March 2007

Build New ND ground system

KCRG Cedar Rapids, IA

 

October 2006

Rebuild 3 tower ground system and install new feed and sample lines.

KRLD Dallas TX

December 2006

Rebuild 2 tower array ground system and building ground infrastructure.

WPHE Phoenixville, PA

September 2006

2 tower DA rebuild

KDWA Hastings, MN

July 2006 ND Build

WCIN Cincinnati, OH

Feb.  2006  5 twr DA Build

WNDA Deland, FL

Dec. 2005  ND Rebuild

KMOX St. Louis, Mo

Nov. 2005  ND Rebuild & other work.

 
     
     
     
 

This Page has had

 
 

Hit Counter

 
 

Visitors Since The Site was Rebuilt September '05

 
     

Site Security

I have built a power point presentation concerning transmitter site security.  It can be viewed as a PDF HERE.

This document is sporadically updated.  The last update available was  09/03/2007.

 

 

 

6ft chain link topped with barbed wire constitutes a good tower base security effort.

This rotten wooden fence wouldn't keep out anything. And would certainly catch an FCC inspectors eye.

This fence is only about 5ft tall and has no barbed wire. This fence is totally unsuitable for site security. Even my fat butt could climb over!

Leaving reels of cable unsecured is an invitation for theft.

This security light was destroyed by one well placed rock. Being a utility owned lamp, it can not be current monitored.

This site had good fencing but should have at least had locked chains thru the gates.

Standard chain link fence latches are not suitable for more than rudimentary security. A sturdy chain should augment this latch.

 

 

 

 

 

 